I'm using Media Scheduler to record some audio, but I keep running into a problem. I have two periodic tasks, but everytime I re-install MC9 (the new versions) or even when I shut down my system, it seems to lose or modify one of the tasks. It keeps the start time intact, but changes the task to "Start MJ", loses the duration entirely and loses the days on which it is to be done. Is anyone else having this problem, or is it my system alone?
Media Center Registered 9.0.165 -- C:\Program Files\J River\Media Jukebox\
Microsoft Windows XP Workstation 5.1 Service Pack 1 (Build 2600)
Intel Pentium 4 1689 MHz MMX / Memory: Total - 392 MB, Free - 149 MB
Internet Explorer: 6.0.2800.1106 / ComCtl32.dll: 5.82 (xpsp1.020828-1920) / Shlwapi.dll: 6.00.2800.1106 (xpsp1.020828-1920)
Shell32.dll: 6.00.2800.1145 (xpsp2.021108-1929) / wnaspi32.dll: Internal ASPI Layer
Ripping / Drive D: Copy mode:ModeBurstBigBuffer CD Type:Auto Read speed:Max
Digital playback: Yes / Use YADB: Yes / Get cover art: Yes / Calc replay gain: Yes / Copy volume: 32767
Eject after ripping: No / Play sound after ripping: No
Burning / Drive D: LITE-ON LTR-24102M Addr: 1:0:0 Speed:12 MaxSpeed:24 Use MJ Engine:Yes
Test mode: No / Eject after writing: Yes / Direct decoding: No / Write CD-Text: Yes
Use playback settings: Yes / Normalization: None