Thought I would share the progress of a Client Install. It is all based around MC19 and will be using 2 servers (one is currently just a chassis reserved for future expansion), 7 media centers and various android & apple devices.
The client (who will from now on be refered to as Ray) decided that they would like to place as much as possible in a central location and hide as much equipment from view as possible, luckily they have a decent sized cupboard that is kind-of central to the 2 main ground floor locations, (AV/Family Room & Lounge) and also a bedroom directly above so out with the 'cupboard-in-a-cupboard'
Ray is a brilliant fabricator and decided to make the rack himself, it will be wall mounted and slide back and forth to allow easy access to the rear
Doesnt Take him long to knock this up:
Checking for fitting:
The Budget Rack Cases we chose to use have top ventilation so we have left a little room to breath between them:
(they also have push/pull air cooling on the front/rear if needed)
Rack fits perfectly in its location, we managed to in squeeze in a shelf for just about everything (I will list the other kit later)
Slides back and forth very easily, I should just about be able to get my fat ass round the back:
The rack is now off to the Powder Coaters while the cupboard is prepared so more to follow soon....